Not produced yet — gated on the observation window
This page is a placeholder on purpose. The held-out evaluation of prediction against the plan is only meaningful on real runs, and the catalog does not have enough of them yet. Nothing here is estimated, extrapolated or filled in from synthetic data; when the window closes the command below is run and its output replaces this page.
What is being waited for¶
PRD §5's exit criterion: 30 days of recorded runs on the catalog's five most-loaded programs. Until then:
- most programs have fewer usable runs than the
--min-runsgate, soruns evaluatereports "fewer usable runs than --min-runs: nothing to hold out yet" rather than a number; - a program with, say, six runs would be split five/one, and a mean absolute error over a single held-out run is not a measurement of anything.
A usable run is one that completed on a wall clock at speed 1; a usable step within it was ended by the executor and never paused. Both filters are defined once, in rhylthyme_cli_runner.history.usable, and a run that fails them is excluded with a reason runs report prints.
The command to run when the window closes¶
From the monorepo root, with the catalog's recorded runs in the runs directory:
# Per program, with the program file so the roll-up knows each step's task
rhylthyme runs evaluate <programId-or-program-file> --format md \
--out rhylthyme-docs/docs/development/reports/duration-evaluation-catalog.md
# ...or every program at once
rhylthyme runs evaluate --all --format md
Add --since YYYY-MM-DD to restrict the corpus to the observation window itself, and --format json --out … beside the Markdown if the numbers are wanted in machine-readable form. The defaults are the ones the acceptance criterion assumes: --holdout 0.2, --min-runs 5, --verdict-min-runs 5, --cv-threshold 0.25.
What the page must answer¶
The acceptance criterion (PRD §8, last item):
A held-out evaluation on catalog runs: predicted duration beats planned
defaultSecondsin mean absolute error for at least the step types the inferentiality report marked predictable.
So the finished page needs, per program:
- the per-step table with
n, MAE predicted, MAE planned and improvement, with thepredictablerows marked (the*column) —runs evaluateprints exactly this; - the roll-up by step type, where the claim is read off the predictable improvement column;
- the
Claimline —holds, or which step types itFAILSfor; - the
basishistogram, which says whether the numbers came from the identical-context branch or from the fitted model.
A step type where the claim fails is not a failure to be hidden: PRD §9 Q1 expects a large group of durations that are the executor's choice rather than a measurable process, and the honest outcome is to leave those step types on the planned values and say so.
In the meantime¶
- The synthetic evaluation — the same command on a corpus with a known generating law, which checks that the measurement itself is sound.